How to Eliminate Delays in Expansion Construction Projects

How to Eliminate Delays in Expansion Construction Projects

No process manufacturer has the luxury of downtime while a construction project is in progress

Lost Opportunity Trap

Delays are a common occurrence with the typical design-bid-build (D/B/B) construction delivery process. Nearly every step of D/B/B presents another potential for a slowdown or postponement of your project, costing you valuable time and money.

Awareness of these potential delays is half the battle. Once you understand the delays inherent in traditional D/B/B construction, finding a productive alternative becomes that much easier.

Download the Lost Opportunity Trap for an in-depth look at the ways the D/B/B delivery method can be detrimental to your project, and learn about an alternative construction approach that eliminates these liabilities.




For more information about the most timely and cost-effective delivery method for your next process manufacturing construction project, contact Brandon Gartee at 419.720.2677 or Brandon.Gartee@RLGbuilds.com.



Recent Posts

HVAC Equipment Refurbishment Helps Save Money

HVAC Equipment Refurbishment Helps Save Money

Making capital equipment replacement decisions is never easy, due to the potential impact on budgets, operations, and occupant comfort. If you have...

Honoring Black History Month in Our Community

Honoring Black History Month in Our Community

HONORING BLACK HISTORY MONTH IN OUR COMMUNITY In honor of Black History Month we have curated a list of community events not only happening in the...

New Solution for Pipe and Drain Line Clogs

New Solution for Pipe and Drain Line Clogs

Hydro Jetting is Now Available from GEM Service